Place of Origin: | China |
---|---|
Brand Name: | Wakestone |
Certification: | CE, ISO |
Model Number: | 68S |
Minimum Order Quantity: | Negotiable |
Price: | Negotiable |
Packaging Details: | Export Wooden Cases or pallets |
Delivery Time: | 5-7 Workdays |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 2000 Sets per year |
Impact Rate: | 500-900 Bpm | Chisel Material: | 42 Crmo |
---|---|---|---|
Weight: | 300 Kg | Hose Diameter: | 1/2 Inch |
OEM Service: | Available | Warranty: | 14 Months |
Highlight: | 900 Bpm Excavator Concrete Breaker,300 kg Excavator Concrete Breaker,SUMITOMO Excavator Hydraulic Rock Hammer |
Excavator Hydraulic Rock Hammer Quartering Breaker For Mini Excavator SUMITOMO
Description
1. High Strength and wear resistance steel plate adopted for main parts.
2. Compatible with various brands of excavator and backhoe loader.
3. Well heat treatment for through bolt and cylinder, protecting hydraulic breaker from fracture damage.
4. Unique valve system. JISAN hydraulic breakers adopt simple hydraulic circuit system, which reduce oil consumption and improve working efficiency.
5. First-class quality. Introduce processing equipments and main body producer technician from Korean to guarantee the quality.
6. Powerful stroke. Compared with other brand's products, JISAN breaker has more powerful stroke and reliable performance.
We also wholesale a full range of spare parts including chisel ,ring bush , back head and front head, cylinder, seal kits ,etc.
Application
1. Mining: Mountains, mining, crushing, secondary crushing
2. Metallurgy, slag cleaning, ladle furnace demolition, demolition equipment foundation body dissatisfied
3. Railway, tunnel, bridge, mountain down.
4. Highway: highway repair, cement pavement broken, foundation excavation.
5. Municipal gardens, concrete crushing, gas engineering construction, the transformation of the old city.
6. Building: the old building demolition, reinforced concrete broken.
Package
1. The standard free spare parts delivered with hydraulic breaker including: two pieces of Chisel, two pieces of high pressure oil hoses, a set of nitrogen charging device includes a gas bottle and a pressure gauge , a set of repair tools contained in tool box.
2. Inner is stretch film, outside is export wooden case or as customer’s request
Delivery
1. Delivery time: Usually 3-7days (1-5sets) after down payment.
2. We can arrange ocean or air transportation according to your request from any port of China.