Place of Origin: | China |
---|---|
Brand Name: | Wakestone |
Certification: | CE,ISO |
Model Number: | WSTB68 |
Minimum Order Quantity: | 1PCS |
Price: | Negotiable |
Packaging Details: | Export Wooden Cases or pallets |
Delivery Time: | 5-7 Workdays |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 700 Sets per year |
Working Pressure: | 110-140 Kg/cm2 | Length: | 1347mm |
---|---|---|---|
Required Oil Flow: | 40-70 L/Min | Application: | Demolition , Quarry , Mining Etc |
Weight: | 290 Kg | Service: | OEM Service Available |
Highlight: | Box Type Hydraulic Breaker Hammer,1347mm Hydraulic Breaker Hammer |
Excavator TOP Type Hydraulic Breaker Skid Steer Backhoe Loader Mounted Hammer
hydraulic rock breakers bring powerful performance and high productivity. Whether for demolishing concrete or breaking rocks, Wakestone breakers are designed to give you maximum productivity and minimum breakdown. Wakestone Breaker is your first choice for economic, reliable performance, long durability and low maintenance cost.
Description
1. High Strength and wear resistance steel plate adopted for main parts.
2. Compatible with various brands of excavator and backhoe loader.
3. Well heat treatment for through bolt and cylinder, protecting hydraulic breaker from fracture damage.
4. Unique valve system. Wakestone hydraulic breakers adopt simple hydraulic circuit system, which reduce oil consumption and improve work efficiency.
5. First-class quality. Introduce processing equipments and experienced technician from Korean.
6. Powerful stroke. Compared with other brand, Wakestone breaker has more powerful stroke and reliable performance.
Application
1. Mining: Mountains, mining, crushing, secondary crushing
2. Metallurgy, slag cleaning, ladle furnace demolition, demolition equipment foundation body dissatisfied
3. Railway, tunnel, bridge, mountain down.
4. Highway: highway repair, cement pavement broken, foundation excavation.
5. Municipal gardens, concrete crushing, gas engineering construction, the transformation of the old city.
6. Building: the old building demolition, reinforced concrete broken.
Package
1. The standard free spare parts delivered with hydraulic breaker including: two pieces of Chisel, two pieces of high pressure oil hoses, a set of nitrogen charging device includes a gas bottle and a pressure gauge , a set of repair tools contained in tool box.
2. Inner is stretch film, outside is export wooden case or as customer’s request
Delivery
1. Delivery time: Usually 3-7days (1-5sets) after down payment.
2. We can arrange ocean or air transportation according to your request from any port of China.